1.5 Task Flows

    The following tasks are required to go through a Federated Validation (FV) project from scratch.



    Task 1). Create a new Federated Validation (FV) project, and assign corresponding PI.

    Task 2). Invite Co-PI(s) to join the FL project. Co-PI(s) join the FV project.

    Task 3). Set up the FV project, including upload initial AI model and model weights.

    Task 4). Create a FV plan under the FV project. Set up the FV plan.

    Task 5). Co-PI(s) upload the ground-truth datasets under the FV plan.

    Task 6). Start the FV plan.

    Task 7). FV plan finishes validation. Receive the final FV report.

    Task 8). Repeat Task 4-7 to select different ground-truth datasets to gain different validation reports.

    Copyright © 2022Powered by Bludit