1.6 Roles, Tasks and Operations
Below please see the Roles and Tasks relationship:
More detailed operations on Dashboards of each task by different roles:
Tasks in-brief:
Task 1: Create project and assign PI (Fed-Admin).
Task 2: PI invites Co-PIs. Co-PI joins project.
Task 3: Setup project (PI).
Task 4: Create and setup plan (PI).
Task 5: Upload datasets (Co-PIs and/or PI).
Task 6: Start plan (PI).
Task 7: Review result (PI).